Name:SR 56 - US 221 over LIMESTONE CREEK
Structure number:000000020900100
Location:S CITY LIMITS MT VERNON
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:9.8 ft. [3.0 m]
Total length:21.0 ft. [6.4 m]
Roadway width between curbs:34.1 ft. [10.4 m]
Deck width edge-to-edge:36.7 ft. [11.2 m]
Owner:State Highway Agency [01]
Year built:1937
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: May 2018

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:1,500 [as of 2011]
Truck traffic:1% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:92.2
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$123,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
May 2018Good7 out of 10150092.2
May 2016Good7 out of 10150092.2
June 2014Good7 out of 10150092.2
May 2012Good7 out of 10150091.2
May 2010Good7 out of 10189091.1
June 2008Good7 out of 10189091.1
May 2006Good7 out of 10179091.1
May 2004Good7 out of 10203090.1
April 2002Good7 out of 10200091.1
June 2000Good7 out of 10220090.0
June 1998Good7 out of 10208090.1
November 1995Good7 out of 10208089.0
December 1993Good7 out of 10208089.0
December 1991Good7 out of 10208089.0

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Culvert
Reinforced Concrete Culvertlinear ft.7207200