Share:

PACKING HOUSE RD over CSX RAILROAD

Map

Coordinates:
+32.64791, -84.52063
32°38'52" N, 84°31'14" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:PACKING HOUSE RD over CSX RAILROAD
Structure number:000000026350530
Location:2 MI S OF TALBOTTON
Purpose:Carries highway over railroad
Route classification:Local (Rural) [09]
Length of largest span:21.0 ft. [6.4 m]
Total length:97.1 ft. [29.6 m]
Roadway width between curbs:14.4 ft. [4.4 m]
Deck width edge-to-edge:16.7 ft. [5.1 m]
Owner:Railroad [27]
Year built:1940
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:5
Main spans material:Wood or timber [7]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

Latest Available Inspection: January 2016

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:490 [as of 2012]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Roadway alignment appraisal:Basically intolerable requiring high priority of replacement [2]
Scour condition:Bridge not over waterway. [N]
Operating rating:29.7 tons [27.0 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Sufficiency rating:33.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$413,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
January 201633.9PoorFairFairPoorSD490
January 201433.9PoorFairPoorPoorSD490
January 201232.7PoorFairPoorPoorSD600
January 201032.7PoorFairPoorPoorSD620
January 20089.6PoorFairPoorPoorSD620
January 200612.3PoorFairPoorPoorSD390
January 20048.1PoorFairPoorPoorSD740
January 20028.1PoorFairPoorPoorSD740
January 200011.4PoorPoorSeriousCriticalSD470
January 199811.9PoorFairFairSeriousSD430
January 199611.5PoorFairFairSeriousSD430
January 199412.0PoorFairFairSeriousSD390
January 199213.6PoorFairFairSeriousSD270

Element Data

Source: National Bridge Elements dataset, 2016 edition. This feature is experimental.
ElementUnitsQuantity1. Good2. Fair3. Poor4. Serious
Superstructure
Timber Girder/Beamlinear ft.87377250510
Substructure
Timber Abutmentlinear ft.3434000
Timber Pileeach2702160
Timber Pier Caplinear ft.6464000
Deck
Timber Decksq. ft.1,6111,474251120
Bridge Rail
Timber Bridge Raillinear ft.194194000