US 1- SR 15 over COBB CREEK
Map
Coordinates:
+32.02031, -82.3465432°01'13" N, 82°20'48" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | US 1- SR 15 over COBB CREEK |
Structure number: | 000000027900030 |
Location: | 11 MI S OF LYONS |
Purpose: | Carries highway over waterway |
Route classification: | Principal Arterial - Other (Rural) [02] |
Length of largest span: | 29.9 ft. [9.1 m] |
Total length: | 420.0 ft. [128.0 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 29.9 ft. [9.1 m] |
Owner: | State Highway Agency [01] |
Year built: | 1940 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 14 |
Main spans material: | Concrete [1] |
Main spans design: | Tee beam [04] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: July 2017
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 3,720 [as of 2012] |
Truck traffic: | 21% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Better than present minimum criteria [7] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
Sufficiency rating: | 64.3 |
Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
Estimated cost of work: | $2,462,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
July 2017 | Fair | Good | Satisfactory | Satisfactory | 3720 | 64.3 |
July 2015 | Fair | Good | Satisfactory | Satisfactory | 3720 | 64.3 |
July 2013 | Fair | Good | Satisfactory | Satisfactory | 3720 | 64.3 |
July 2011 | Fair | Good | Satisfactory | Satisfactory | 3530 | 64.4 |
July 2009 | Fair | Good | Satisfactory | Satisfactory | 3840 | 64.3 |
June 2007 | Fair | Good | Satisfactory | Satisfactory | 3980 | 64.3 |
July 2005 | Fair | Good | Satisfactory | Satisfactory | 3770 | 64.3 |
July 2003 | Fair | Good | Satisfactory | Satisfactory | 4600 | 64.1 |
October 2001 | Fair | Good | Satisfactory | Satisfactory | 4500 | 64.1 |
October 1999 | Fair | Good | Satisfactory | Satisfactory | 4170 | 64.2 |
August 1997 | Fair | Good | Satisfactory | Satisfactory | 4170 | 62.2 |
April 1995 | Fair | Good | Satisfactory | Satisfactory | 4170 | 60.4 |
June 1993 | Fair | Good | Satisfactory | Satisfactory | 4170 | 60.4 |
June 1991 | Fair | Good | Fair | Satisfactory | 4170 | 50.1 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Reinforced Concrete Girder/Beam | linear ft. | 2,100 | 2,092 | 8 | 0 | 0 |
Deck |
Reinforced Concrete Top Flange | sq. ft. | 12,600 | 12,600 | 0 | 0 | 0 |
Wearing Surfaces | sq. ft. | 9,996 | 9,996 | 0 | 0 | 0 |
Substructure |
Reinforced Concrete Column | each | 26 | 21 | 5 | 0 | 0 |
Reinforced Concrete Abutment | linear ft. | 58 | 57 | 1 | 0 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 325 | 325 | 0 | 0 | 0 |
Joints |
Pourable Joint | linear ft. | 360 | 0 | 360 | 0 | 0 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 840 | 834 | 6 | 0 | 0 |