Share:

BROWNING SHOALS RD over HARD LABOR CREEK

Map

Coordinates:
+33.68143, -83.63046
33°40'53" N, 83°37'50" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:BROWNING SHOALS RD over HARD LABOR CREEK
Structure number:000000029750340
Location:5.5 MI E OF SOCIAL CIRCLE
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:40.0 ft. [12.2 m]
Total length:182.1 ft. [55.5 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:30.2 ft. [9.2 m]
Owner:County Highway Agency [02]
Year built:1985
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 13.5 / HS 15 [3]
Number of main spans:5
Main spans material:Prestressed concrete [5]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: July 2017

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:490 [as of 2012]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Sufficiency rating:96.8
Estimated cost of work:$1,067,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
July 2017GoodGoodGoodGood49096.8
August 2015GoodGoodGoodGood49096.8
August 2013GoodGoodGoodGood49096.8
August 2011GoodGoodGoodGood60089.2
August 2009GoodGoodGoodGood62089.2
September 2007GoodGoodGoodGood62089.2
August 2005GoodGoodGoodGood251079.7
September 2003GoodGoodGoodGood74089.2
September 2001GoodGoodGoodGood74087.9
August 1999GoodGoodGoodGood47088.0
August 1997GoodGoodGoodVery Good43088.0
August 1995GoodVery GoodVery GoodVery Good43088.0
January 1994GoodVery GoodVery GoodVery Good40089.0
March 1992GoodVery GoodVery GoodVery Good40089.0
September 1990GoodVery GoodVery GoodVery Good23091.1

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Closed Web/Box Girderlinear ft.1,20493726700
Deck
Prestressed Concrete Top Flangesq. ft.5,5154,63787800
Substructure
Reinforced Concrete Columneach88000
Reinforced Concrete Abutmentlinear ft.68551300
Reinforced Concrete Pile Cap/Footinglinear ft.2424000
Reinforced Concrete Pier Caplinear ft.112922000
Joints
Pourable Jointlinear ft.1680056112
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.3642838100