HAWAII BELT RD over HILEA STRM
Map
Coordinates:
+19.12468, -155.5259319°07'29" N, 155°31'33" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | HAWAII BELT RD over HILEA STRM |
Structure number: | 001000110306489 |
Location: | 2.84MI S/HONUAPO WHARF RD |
Purpose: | Carries highway over waterway |
Route classification: | Minor Arterial (Rural) [06] |
Length of largest span: | 19.0 ft. [5.8 m] |
Total length: | 41.0 ft. [12.5 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 26.9 ft. [8.2 m] |
Owner: | State Highway Agency [01] |
Year built: | 1940 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 2 |
Main spans material: | Wood or timber [7] |
Main spans design: | Stringer/Multi-beam or girder [02] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: May 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 3,600 [as of 2017] |
Truck traffic: | 4% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 51.3 |
Recommended work: | Other structural work, including hydraulic replacements. [38] |
Estimated cost of work: | $2,582,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2018 | Fair | Satisfactory | Fair | Fair | 3600 | 51.3 |
February 2018 | Fair | Satisfactory | Fair | Fair | 2525 | 51.9 |
May 2016 | Fair | Good | Fair | Fair | 2525 | 60.7 |
October 2014 | Fair | Good | Fair | Fair | 2525 | 60.7 |
October 2012 | Fair | Good | Fair | Fair | 2525 | 60.7 |
October 2010 | Fair | Good | Satisfactory | Satisfactory | 2525 | 71.9 |
January 2009 | Good | Good | Good | Good | 2525 | 68.9 |
January 2007 | Fair | Fair | Fair | Fair | 2075 | 56.9 |
October 2004 | Fair | Fair | Fair | Fair | 2075 | 56.9 |
October 2002 | Fair | Fair | Fair | Fair | 2075 | 56.9 |
October 2000 | Fair | Fair | Satisfactory | Satisfactory | 2075 | 66.0 |
October 1998 | Fair | Fair | Satisfactory | Satisfactory | 2075 | 66.0 |
October 1996 | Fair | Fair | Satisfactory | Satisfactory | 2127 | 65.7 |
October 1994 | Fair | Fair | Satisfactory | Satisfactory | 975 | 68.2 |
December 1992 | Fair | Satisfactory | Good | Good | 1814 | 68.9 |
December 1990 | Fair | Satisfactory | Good | Good | 1814 | 68.9 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Timber Girder/Beam | linear ft. | 418 | 393 | 0 | 25 | 0 |
Substructure |
Timber Column | each | 5 | 3 | 1 | 1 | 0 |
Masonry Pier Wall | linear ft. | 24 | 12 | 0 | 12 | 0 |
Masonry Abutment | linear ft. | 52 | 28 | 0 | 24 | 0 |
Timber Pier Cap | linear ft. | 27 | 17 | 6 | 4 | 0 |
Joints |
Pourable Joint | linear ft. | 48 | 38 | 0 | 0 | 10 |
Deck |
Timber Deck | sq. ft. | 1,007 | 907 | 0 | 100 | 0 |
Wearing Surfaces | sq. ft. | 1,007 | 1,007 | 0 | 0 | 0 |
Bridge Rail |
Timber Bridge Rail | linear ft. | 76 | 72 | 4 | 0 | 0 |