Share:

N HOTEL ST over NUUANU STRM

Map

Coordinates:
+21.31384, -157.86388
21°18'50" N, 157°51'50" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:N HOTEL ST over NUUANU STRM
Structure number:003083981400003
Location:INT/RIVER ST/N HOTEL ST
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:41.0 ft. [12.5 m]
Total length:101.1 ft. [30.8 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:45.9 ft. [14.0 m]
Skew angle:27°
Owner:County Highway Agency [02]
Year built:1936
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: September 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:1,428 [as of 1988]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:76.9
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$676,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2017FairFairFairSatisfactory142876.9
September 2015FairFairFairSatisfactory142876.9
February 2014FairFairFairSatisfactory142857.9
July 2011FairFairFairFair142857.9
July 2009FairGoodSatisfactoryFair142858.9
February 2008FairSatisfactorySatisfactorySatisfactory142866.9
January 2002FairSatisfactoryGoodGood142866.9
April 2000FairSatisfactoryGoodGood142872.6
June 1998GoodGoodGoodGood142871.8
April 1996GoodGoodGoodGood142871.5
March 1994GoodGoodGoodGood142871.5
June 1992GoodGoodGoodGood142871.5
March 1990GoodVery GoodGoodGood142871.5

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Reinforced Concrete Pier Walllinear ft.100901000
Reinforced Concrete Abutmentlinear ft.1257332200
Reinforced Concrete Pile Cap/Footinglinear ft.100100000
Timber Pileeach116116000
Joints
Pourable Jointlinear ft.1841270057
Bridge Rail
Steel or Aluminum Bridge Raillinear ft.200198200
Steel Protective Coatingsq. ft.11,20011,200000
Reinforced Concrete Bridge Raillinear ft.2402122710
Concrete Protective Coatingsq. ft.840840000
Deck
Reinforced Concrete Slabsq. ft.4,6124423,6405300