I-74 (EB-SB) over MISSISSIPPI RIVER
Map
Coordinates:
+41.52221, -90.5133141°31'20" N, 90°30'48" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | I-74 (EB-SB) over MISSISSIPPI RIVER |
Structure number: | 000000000047290 |
Location: | IN BETTENDORF |
Purpose: | Carries highway over highway and waterway |
Route classification: | Principal Arterial - Interstate (Urban) [11] |
Length of largest span: | 740.2 ft. [225.6 m] |
Total length: | 3393.2 ft. [1034.2 m] |
Roadway width between curbs: | 24.0 ft. [7.3 m] |
Deck width edge-to-edge: | 27.2 ft. [8.3 m] |
Vertical clearance above deck: | 17.1 ft. [5.2 m] |
Vertical clearance below bridge: | 65.6 ft. [20.0 m] |
Owner: | State Highway Agency [01] |
Year built: | 1960 |
Year reconstructed: | 1975 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 3 |
Main spans material: | Steel continuous [4] |
Main spans design: | Suspension [13] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Integral Concrete (separate non-modified layer of concrete added to structural deck) [2] |
Latest Available Inspection: August 2018
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 33,800 [as of 2018] |
Truck traffic: | 4% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
Pier/abutment protection: | None present but re-evaluation suggested [5] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 55.7 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
August 2018 | Fair | Satisfactory | Fair | Satisfactory | 33800 | 55.7 |
August 2016 | Fair | Satisfactory | Fair | Satisfactory | 36000 | 55.3 |
August 2014 | Fair | Satisfactory | Fair | Satisfactory | 35250 | 55.5 |
July 2012 | Fair | Satisfactory | Fair | Satisfactory | 30350 | 56.2 |
June 2010 | Fair | Satisfactory | Fair | Satisfactory | 33550 | 55.4 |
July 2008 | Fair | Satisfactory | Fair | Satisfactory | 33600 | 55.4 |
June 2006 | Fair | Satisfactory | Fair | Satisfactory | 35400 | 51.0 |
October 2004 | Fair | Satisfactory | Fair | Satisfactory | 35550 | 51.0 |
October 2002 | Fair | Satisfactory | Fair | Satisfactory | 38900 | 50.4 |
August 2000 | Fair | Satisfactory | Fair | Satisfactory | 36100 | 50.9 |
October 1997 | Fair | Satisfactory | Fair | Satisfactory | 13200 | 0.0 |
October 1993 | Fair | Satisfactory | Fair | Satisfactory | 33300 | 52.4 |
July 1990 | Fair | Satisfactory | Fair | Satisfactory | 29450 | 52.9 |