Share:

LOCAL 218 ST over PLUM CREEK

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+42.79444, -91.43333
42°47'40" N, 91°25'60" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:LOCAL 218 ST over PLUM CREEK
Structure number:000000000141640
Location:0890436
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:99.1 ft. [30.2 m]
Total length:100.1 ft. [30.5 m]
Roadway width between curbs:14.8 ft. [4.5 m]
Deck width edge-to-edge:15.7 ft. [4.8 m]
Vertical clearance above deck:14.1 ft. [4.3 m]
Owner:County Highway Agency [02]
Year built:1915
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: May 2009

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:140 [as of 2001]
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Basically intolerable requiring high priority of corrrective action [3]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:16.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$250,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2009PoorPoorSeriousPoor14016.4
December 1998PoorPoorPoorPoor12018.9
December 1991PoorPoorFairFair9035.3