Share:

US 2 over JOHNSON CREEK

Map

Coordinates:
+48.21183, -116.71992
48°12'43" N, 116°43'12" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:US 2 over JOHNSON CREEK
Structure number:000000000010015
Location:3.4 E. LACLEDE
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:47.9 ft. [14.6 m]
Total length:144.0 ft. [43.9 m]
Roadway width between curbs:34.1 ft. [10.4 m]
Deck width edge-to-edge:37.1 ft. [11.3 m]
Skew angle:45°
Owner:State Highway Agency [01]
Year built:1970
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

Latest Available Inspection: May 2018

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:3,700 [as of 2016]
Truck traffic:14% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:64.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,713,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
May 2018FairSatisfactorySatisfactoryFair370064.9
May 2016FairFairSatisfactoryFair370064.7
May 2015PoorPoorSatisfactoryFair370062.7
May 2014PoorPoorSatisfactoryFair370062.7
May 2013PoorPoorSatisfactorySatisfactory400073.7
May 2011FairFairSatisfactorySatisfactory400075.6
May 2009FairFairSatisfactorySatisfactory440075.6
May 2007FairSatisfactorySatisfactorySatisfactory370076.6
May 2005FairSatisfactorySatisfactorySatisfactory370076.6
May 2003FairSatisfactorySatisfactorySatisfactory380076.6
May 2001FairSatisfactorySatisfactorySatisfactory380076.4
May 1999FairSatisfactorySatisfactorySatisfactory350076.4
May 1997FairSatisfactoryGoodSatisfactory340076.4
May 1995FairSatisfactoryGoodSatisfactory440075.4
May 1993FairSatisfactoryGoodSatisfactory294075.7
May 1991FairGoodVery GoodSatisfactory294075.7

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Prestressed Concrete Girder/Beamlinear ft.720720000
Deck
Reinforced Concrete Decksq. ft.5,3283,8201,50440
Substructure
Reinforced Concrete Abutmentlinear ft.96682800
Steel Pileeach1600160
Steel Protective Coatingsq. ft.667066700
Reinforced Concrete Pier Caplinear ft.107106100
Bearings
Elastomeric Bearingeach2002000
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.2882513700