Share:

SH 7 over CLEARWATER RIVER

Map

Coordinates:
+46.49035, -116.26618
46°29'25" N, 116°15'58" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:SH 7 over CLEARWATER RIVER
Structure number:000000000010206
Location:IN OROFINO
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:149.9 ft. [45.7 m]
Total length:428.2 ft. [130.5 m]
Roadway width between curbs:39.4 ft. [12.0 m]
Deck width edge-to-edge:50.9 ft. [15.5 m]
Owner:State Highway Agency [01]
Year built:1998
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Epoxy Overlay [5]

Latest Available Inspection: October 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:4,400 [as of 2014]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:80.9 tons [73.5 metric tons]
Inventory rating:47.9 tons [43.5 metric tons]
Sufficiency rating:74.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$6,704,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
October 201574.7FairSatisfactoryGoodSatisfactory-4400
October 201374.7FairSatisfactoryVery GoodSatisfactory-4400
October 201167.8FairSatisfactoryVery GoodSatisfactory-7000
October 200967.8FairSatisfactoryVery GoodSatisfactory-7000
October 200767.8FairSatisfactoryVery GoodSatisfactory-7700
October 200567.8FairSatisfactoryVery GoodSatisfactory-7400
October 200367.8FairSatisfactoryVery GoodSatisfactory-6800
October 200167.8FairSatisfactoryVery GoodSatisfactory-6800
October 200067.8FairSatisfactoryVery GoodVery Good-7500
December 199867.8GoodExcellentExcellentExcellent-7500