Share:

STC2802;BASELINE R over SOLDIER CREEK

Map

Coordinates:
+43.36972, -114.78917
43°22'11" N, 114°47'21" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:STC2802;BASELINE R over SOLDIER CREEK
Structure number:000000000019531
Location:2.0 N. FAIRFIELD
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:16.4 ft. [5.0 m]
Total length:34.1 ft. [10.4 m]
Roadway width between curbs:30.2 ft. [9.2 m]
Deck width edge-to-edge:33.8 ft. [10.3 m]
Owner:County Highway Agency [02]
Year built:1992
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Frame [07]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: June 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:340 [as of 2015]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:97.8

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
June 2016FairSatisfactorySatisfactorySatisfactory34097.8
June 2014FairSatisfactorySatisfactorySatisfactory40097.7
June 2012FairSatisfactorySatisfactorySatisfactory40097.9
June 2010FairSatisfactorySatisfactorySatisfactory39097.9
June 2008FairSatisfactoryGoodVery Good23097.9
June 2006FairSatisfactoryGoodVery Good23097.9
June 2004FairSatisfactoryGoodVery Good23097.9
June 2002FairSatisfactoryGoodVery Good23097.9
June 2000GoodGoodGoodVery Good26097.9
June 1998GoodGoodGoodVery Good26097.9
June 1996GoodGoodGoodVery Good26097.9
June 1994GoodVery GoodVery GoodVery Good26097.9
June 1992GoodExcellentExcellentExcellent27097.9

Element Data

Source: National Bridge Elements dataset, 2018 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Reinforced Concrete Pier Walllinear ft.3325800
Reinforced Concrete Abutmentlinear ft.89533600
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.7266600
Deck
Reinforced Concrete Slabsq. ft.1,216545612590