DAVIS ROAD over LITTLE VALLEY CREEK
Map
Coordinates:
+42.85833, -115.8755642°51'30" N, 115°52'32" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | DAVIS ROAD over LITTLE VALLEY CREEK |
Structure number: | 000000000028255 |
Location: | 1.6 S. 4.0 W. BRUNEAU |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 28.9 ft. [8.8 m] |
Total length: | 32.2 ft. [9.8 m] |
Roadway width between curbs: | 23.0 ft. [7.0 m] |
Deck width edge-to-edge: | 24.0 ft. [7.3 m] |
Owner: | County Highway Agency [02] |
Year built: | 1938 |
Year reconstructed: | 1982 |
Historic significance: | Bridge is possibly eligible for the National Register of Historic Places [3] |
Design load: | M 13.5 / H 15 [2] |
Main span material: | Wood or timber [7] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Bituminous [6] |
Latest Available Inspection: February 2018
Good/Fair/Poor Condition: | Fair |
Status: | Posted for load [P] |
Average daily traffic: | 50 [as of 2015] |
Truck traffic: | 5% of total traffic |
Deck condition: | Satisfactory [6 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Satisfactory [6 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Water adequacy appraisal: | Better than present minimum criteria [7] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 75.5 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $368,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
February 2018 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
February 2016 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
February 2014 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
February 2013 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
February 2012 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
February 2011 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
April 2009 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
April 2008 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
April 2007 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
April 2006 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
April 2005 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
April 2004 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
April 2003 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
April 2002 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
April 2000 | Fair | Satisfactory | Satisfactory | Fair | 50 | 65.5 |
April 1999 | Fair | Satisfactory | Satisfactory | Fair | 50 | 65.5 |
April 1998 | Fair | Satisfactory | Satisfactory | Fair | 50 | 65.5 |
April 1997 | Fair | Satisfactory | Satisfactory | Fair | 50 | 65.5 |
April 1996 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
April 1995 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
April 1994 | Fair | Satisfactory | Satisfactory | Satisfactory | 50 | 75.5 |
April 1993 | Fair | Satisfactory | Good | Satisfactory | 50 | 75.5 |
April 1992 | Fair | Good | Good | Satisfactory | 50 | 75.5 |
April 1991 | Good | Good | Very Good | Good | 50 | 75.5 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Timber Girder/Beam | linear ft. | 253 | 197 | 56 | 0 | 0 |
Substructure |
Timber Abutment | linear ft. | 49 | 0 | 49 | 0 | 0 |
Deck |
Timber Deck | sq. ft. | 764 | 764 | 0 | 0 | 0 |
Wearing Surfaces | sq. ft. | 730 | 684 | 46 | 0 | 0 |