Share:

BELMONT AVE over N BR CHGO RVR

Map

Coordinates:
+41.93941, -87.69280
41°56'22" N, 87°41'34" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:BELMONT AVE over N BR CHGO RVR
Structure number:016600400000000
Old structure number:000016600426623 (from 1992 edition)
Location:3200 N & 2600 W
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:169.0 ft. [51.5 m]
Total length:288.1 ft. [87.8 m]
Roadway width between curbs:49.9 ft. [15.2 m]
Deck width edge-to-edge:65.9 ft. [20.1 m]
Vertical clearance below bridge:17.1 ft. [5.2 m]
Owner:City or Municipal Highway Agency [04]
Year built:1917
Year reconstructed:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: June 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:3,350 [as of 2014]
Truck traffic:17% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:48.8 tons [44.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:79.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,011,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201579.6FairFairSatisfactorySatisfactoryFO3350
June 201379.6FairFairSatisfactorySatisfactoryFO3350
June 201173.1FairFairSatisfactoryGoodFO14000
November 200873.3FairSatisfactoryGoodGoodFO16000
November 200673.3FairSatisfactoryGoodGoodFO16000
October 200467.4FairSatisfactoryGoodGoodFO28100
October 200267.4FairSatisfactoryGoodGoodFO28100
November 200067.4FairSatisfactoryGoodGoodFO28100
July 199867.4FairSatisfactoryGoodGoodFO28100
May 199671.4FairSatisfactoryGoodGoodFO19900
May 199473.7GoodGoodGoodGood-19900
September 199274.3GoodGoodGoodGood-18500
June 199174.3GoodVery GoodVery GoodGood-18500