Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:CH 1 LOST NATION R over FRANKLIN CREEK
Structure number:052369200000000
Old structure number:000052369212000 (from 1992 edition)
Location:0.8 MI S OF OGLE CO
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:49.9 ft. [15.2 m]
Total length:149.9 ft. [45.7 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:29.9 ft. [9.1 m]
Owner:County Highway Agency [02]
Year built:1957
Year reconstructed:2002
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Precast Panels [2]
Wearing surface:Bituminous [6]

Latest Available Inspection: February 2014

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:2,150 [as of 2012]
Truck traffic:3% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Structural appraisal:Equal to present desirable criteria [8]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:85.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$717,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
February 2014GoodVery GoodVery GoodVery Good215085.6
March 2010GoodVery GoodVery GoodVery Good215085.6
March 2008GoodVery GoodVery GoodVery Good215085.6
January 2004GoodExcellentExcellentVery Good220085.5
September 2001FairSatisfactoryFairSatisfactory220015.2
August 1999FairSatisfactoryFairSatisfactory185059.7
June 1998FairSatisfactoryFairSatisfactory185059.7
August 1995FairSatisfactoryFairSatisfactory185059.7
September 1993FairSatisfactoryFairSatisfactory190059.6
July 1991FairSatisfactoryFairSatisfactory190059.6