TR-220 over Douglas CREEK
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+38.84070, -87.9834638°50'27" N, 87°59'00" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | TR-220 over Douglas CREEK |
Structure number: | 080309800000000 |
Old structure number: | 000080309817684 (from 1992 edition) |
Location: | 1 MI N STRINGTOWN |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 27.9 ft. [8.5 m] |
Total length: | 27.9 ft. [8.5 m] |
Roadway width between curbs: | 14.8 ft. [4.5 m] |
Deck width edge-to-edge: | 16.1 ft. [4.9 m] |
Owner: | Town or Township Highway Agency [03] |
Year built: | 1909 |
Year reconstructed: | 1965 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Main span material: | Steel [3] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Wood or Timber [7] |
Latest Available Inspection: March 2016
Good/Fair/Poor Condition: | Poor |
Status: | Bridge closed to all traffic [K] |
Average daily traffic: | 10 [as of 2008] |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Critical [2 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Deck geometry appraisal: | Equal to present minimum criteria [6] |
Water adequacy appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Roadway alignment appraisal: | Basically intolerable requiring high priority of replacement [2] |
Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 13.8 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $72,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
March 2016 | Poor | Fair | Critical | Fair | 10 | 13.8 |
April 2013 | Poor | Fair | Critical | Fair | 10 | 13.8 |
March 2011 | Poor | Fair | Critical | Fair | 10 | 13.0 |
January 2009 | Poor | Fair | Critical | Fair | 10 | 13.0 |
February 2007 | Poor | Fair | Critical | Fair | 29 | 13.3 |
January 2005 | Poor | Fair | Poor | Fair | 29 | 17.2 |
March 2003 | Poor | Fair | Poor | Fair | 29 | 17.2 |
January 2001 | Fair | Fair | Fair | Fair | 9 | 30.8 |
March 1999 | Fair | Fair | Fair | Fair | 9 | 30.8 |
January 1997 | Fair | Fair | Fair | Fair | 9 | 30.8 |
February 1995 | Fair | Fair | Fair | Fair | 9 | 30.9 |
March 1993 | Fair | Good | Fair | Fair | 10 | 31.9 |
January 1991 | Fair | Good | Fair | Fair | 9 | 31.9 |