TR 17 over CEDAR CREEK
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+37.58414, -89.2940537°35'03" N, 89°17'39" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | TR 17 over CEDAR CREEK |
Structure number: | 091313800000000 |
Old structure number: | 000091313829125 (from 1992 edition) |
Location: | 1.4 MI NE ALTO PASS |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 29.9 ft. [9.1 m] |
Total length: | 30.8 ft. [9.4 m] |
Roadway width between curbs: | 14.4 ft. [4.4 m] |
Deck width edge-to-edge: | 14.4 ft. [4.4 m] |
Owner: | Town or Township Highway Agency [03] |
Year built: | 1976 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Main span material: | Steel [3] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Wood or Timber [8] |
Wearing surface: | Wood or Timber [7] |
Latest Available Inspection: March 2017
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 50 [as of 2015] |
Truck traffic: | 40% of total traffic |
Deck condition: | Very Good [8 out of 9] |
Superstructure condition: | Poor [4 out of 9] |
Substructure condition: | Serious [3 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Deck geometry appraisal: | Equal to present minimum criteria [6] |
Water adequacy appraisal: | Better than present minimum criteria [7] |
Roadway alignment appraisal: | Better than present minimum criteria [7] |
Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 27.0 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $55,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
March 2017 | Poor | Very Good | Poor | Serious | 50 | 27.0 |
March 2015 | Poor | Good | Poor | Serious | 50 | 27.0 |
March 2013 | Poor | Good | Poor | Serious | 50 | 27.0 |
March 2011 | Poor | Very Good | Poor | Serious | 59 | 27.0 |
March 2009 | Poor | Fair | Poor | Serious | 250 | 20.5 |
December 2007 | Poor | Fair | Fair | Poor | 250 | 26.5 |
December 2005 | Fair | Satisfactory | Satisfactory | Satisfactory | 250 | 53.2 |
February 2004 | Fair | Satisfactory | Satisfactory | Satisfactory | 175 | 53.3 |
February 2002 | Fair | Satisfactory | Satisfactory | Satisfactory | 175 | 52.0 |
April 1999 | Fair | Fair | Fair | Good | 75 | 45.1 |
February 1997 | Fair | Good | Satisfactory | Good | 75 | 56.2 |
October 1994 | Fair | Good | Satisfactory | Good | 75 | 56.2 |
March 1992 | Good | Good | Good | Good | 75 | 56.2 |