Share:

SR 1 over SALT FORK

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+39.15500, -84.87833
39°09'18" N, 84°52'42" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SR 1 over SALT FORK
Structure number:000020
Location:3.35 N US 50
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:120.1 ft. [36.6 m]
Total length:418.0 ft. [127.4 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:28.9 ft. [8.8 m]
Owner:State Highway Agency [01]
Year built:1941
Year reconstructed:1976
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Truss - Deck [09]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: September 2009

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:5,359 [as of 2004]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:47.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$4,660,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
September 2009PoorPoorFairSatisfactory535947.9
January 2000FairGoodGoodSatisfactory466272.9
December 1989FairFairSatisfactoryFair380060.0