Facts

Name:US 41 NB over PIGEON CREEK
Structure number:014300
Location:00.37 N SR 66
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:104.0 ft. [31.7 m]
Total length:274.9 ft. [83.8 m]
Roadway width between curbs:33.5 ft. [10.2 m]
Deck width edge-to-edge:36.4 ft. [11.1 m]
Owner:State Highway Agency [01]
Year built:1969
Year reconstructed:1996
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

Latest Available Inspection: July 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:21,929 [as of 2004]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:54.9 tons [49.9 metric tons]
Inventory rating:32.9 tons [29.9 metric tons]
Sufficiency rating:89.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$691,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
July 201689.4GoodGoodGoodVery Good-21929
July 201489.4GoodGoodGoodGood-21929
July 201289.4GoodGoodGoodGood-21929
July 201090.3GoodGoodGoodGood-21929
July 200890.3GoodGoodGoodGood-21929
July 200692.9GoodGoodGoodGood-21929
July 200492.9GoodGoodGoodGood-21929
July 200292.9GoodGoodGoodGood-21499
August 200093.1GoodGoodGoodGood-18502
November 199890.1GoodGoodGoodGood-18502
October 199690.1GoodGoodGoodGood-18502
December 199490.3FairSatisfactoryGoodGood-20600
December 199292.3GoodGoodGoodGood-20600
January 199192.3FairSatisfactorySatisfactoryGood-20600