Share:

SR 75 over MIDDLE FK BIG WALNUT CR

Map

Coordinates:
+39.85111, -86.64556
39°51'04" N, 86°38'44" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:SR 75 over MIDDLE FK BIG WALNUT CR
Structure number:024835
Location:00.61 S SR 236
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:43.6 ft. [13.3 m]
Total length:133.9 ft. [40.8 m]
Roadway width between curbs:43.6 ft. [13.3 m]
Deck width edge-to-edge:46.6 ft. [14.2 m]
Skew angle:40°
Owner:State Highway Agency [01]
Year built:1972
Year reconstructed:1995
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

Latest Available Inspection: December 2015

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:900 [as of 2006]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:70.8 tons [64.4 metric tons]
Inventory rating:41.9 tons [38.1 metric tons]
Sufficiency rating:99.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$690,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
December 201599.6FairGoodSatisfactoryGood-900
August 201399.6GoodGoodGoodGood-900
August 201199.6GoodGoodGoodGood-900
August 200999.6FairSatisfactorySatisfactorySatisfactory-900
August 200799.3FairSatisfactorySatisfactorySatisfactory-948
August 200699.5FairSatisfactorySatisfactorySatisfactory-948
August 200599.3FairSatisfactorySatisfactorySatisfactory-948
November 200399.3GoodGoodGoodGood-929
November 200199.3GoodGoodGoodGood-929
September 200099.4GoodGoodGoodGood-721
September 199899.4GoodVery GoodVery GoodVery Good-721
August 199799.4GoodVery GoodVery GoodVery Good-721
August 199599.4GoodVery GoodVery GoodVery Good-703
September 199496.5GoodGoodGoodGood-500
October 199299.5GoodGoodGoodGood-500
January 199198.8FairFairGoodGood-500