Facts

Name:CR 550S over DEER CREEK
Structure number:6700200
Location:00.20 W of CR 25E
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:75.5 ft. [23.0 m]
Total length:276.9 ft. [84.4 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:24.0 ft. [7.3 m]
Owner:County Highway Agency [02]
Year built:1923
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: March 2016

Good/Fair/Poor Condition:Poor
Status:Posted for load [P]
Average daily traffic:110 [as of 2015]
Truck traffic:3% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:37.0 tons [33.6 metric tons]
Inventory rating:27.0 tons [24.5 metric tons]
Sufficiency rating:60.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$111,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
March 201660.3PoorPoorFairFairSD110
March 201560.3PoorPoorFairFairSD110
April 201360.3PoorPoorFairFairSD103
April 201160.0PoorPoorFairFairSD103
March 200974.5PoorPoorFairFairSD100
March 200774.5PoorPoorFairFairSD100
March 200561.4FairSatisfactoryFairSatisfactory-365
March 200372.5FairSatisfactorySatisfactorySatisfactory-352
June 200072.7FairSatisfactorySatisfactoryGood-322
November 199872.5FairSatisfactorySatisfactoryGood-322
June 199672.5FairSatisfactorySatisfactorySatisfactory-305
April 199472.2FairSatisfactorySatisfactorySatisfactory-100
December 199272.2FairSatisfactorySatisfactorySatisfactory-100
January 199088.1FairSatisfactorySatisfactorySatisfactory-100