Share:

BROADWAY AVE over BRANCH OF BAYOU CREEK

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map 

Coordinates:
+37.96000, -87.63222
37°57'36" N, 87°37'56" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:BROADWAY AVE over BRANCH OF BAYOU CREEK
Structure number:8200054
Location:00.30 W OF RED BANK RD
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:20.0 ft. [6.1 m]
Total length:22.0 ft. [6.7 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:26.9 ft. [8.2 m]
Owner:County Highway Agency [02]
Year built:1945
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Concrete [1]
Main span design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2014 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:3,392 [as of 2008]
Truck traffic:3% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:27.0 tons [24.5 metric tons]
Sufficiency rating:57.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$432,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
October 201457.9FairFairFairFairFO3392
October 201257.9FairFairFairFairFO3392
November 201057.6FairFairFairFairFO3392
November 200856.2FairFairFairFairFO3392
December 200656.2FairFairFairFairFO3292
October 200456.5FairFairFairFairFO5000
September 200257.6FairSatisfactoryFairFairFO5000
March 200057.9FairSatisfactoryFairFairFO5000
June 199857.6FairSatisfactoryFairFairFO5000
November 199556.4FairSatisfactoryFairFairFO5000
November 199356.4FairSatisfactoryFairFairFO5000
April 199150.2PoorSatisfactoryPoorFairSD2700
April 198948.2PoorSatisfactoryPoorFairSD2700