Elk Drive over SPRING CREEK
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+38.92901, -98.2233138°55'44" N, 98°13'24" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | Elk Drive over SPRING CREEK |
Structure number: | 000530725104480 |
Location: | 7.0S 3.1E OF VESPER |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 75.1 ft. [22.9 m] |
Total length: | 117.1 ft. [35.7 m] |
Roadway width between curbs: | 17.7 ft. [5.4 m] |
Deck width edge-to-edge: | 18.7 ft. [5.7 m] |
Owner: | County Highway Agency [02] |
Year built: | 1933 |
Historic significance: | Bridge is possibly eligible for the National Register of Historic Places [3] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: October 2016
Good/Fair/Poor Condition: | Poor |
Status: | Bridge closed to all traffic [K] |
Average daily traffic: | 30 [as of 2002] |
Truck traffic: | 5% of total traffic |
Deck condition: | Fair [5 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Serious [3 out of 9] |
Deck geometry appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
Water adequacy appraisal: | Equal to present minimum criteria [6] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank protection has failed. River control devices have been destroyed. Stream bed aggradation, degradation or lateral movement has changed the channel to now threaten the bridge and/or approach roadway. [3] |
Scour condition: | Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. [2] |
Sufficiency rating: | 31.0 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $540,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
October 2016 | Poor | Fair | Fair | Serious | 30 | 31.0 |
October 2015 | Poor | Fair | Fair | Serious | 30 | 31.0 |
November 2014 | Poor | Fair | Fair | Serious | 30 | 31.0 |
November 2013 | Poor | Fair | Fair | Serious | 30 | 30.0 |
November 2012 | Poor | Fair | Fair | Serious | 30 | 30.0 |
October 2011 | Poor | Fair | Fair | Serious | 30 | 30.0 |
October 2010 | Poor | Fair | Fair | Serious | 30 | 30.0 |
February 2010 | Poor | Fair | Fair | Serious | 30 | 30.0 |
January 2007 | Fair | Fair | Fair | Fair | 30 | 30.0 |
December 2004 | Fair | Fair | Fair | Fair | 30 | 30.0 |
November 2002 | Fair | Fair | Fair | Fair | 30 | 30.0 |
March 2000 | Fair | Fair | Satisfactory | Satisfactory | 30 | 39.3 |
September 1998 | Fair | Fair | Satisfactory | Satisfactory | 30 | 39.3 |
August 1996 | Fair | Fair | Satisfactory | Satisfactory | 30 | 39.3 |
December 1994 | Fair | Fair | Satisfactory | Satisfactory | 30 | 31.8 |
December 1992 | Fair | Fair | Satisfactory | Satisfactory | 30 | 31.8 |
December 1990 | Fair | Fair | Satisfactory | Satisfactory | 30 | 31.8 |