Share:

NorthCrawford over Mill Creek

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+37.85147, -94.71017
37°51'05" N, 94°42'37" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:NorthCrawford over Mill Creek
Structure number:509250060000034
Location:North of Fort Scott
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:83.0 ft. [25.3 m]
Total length:138.1 ft. [42.1 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:26.6 ft. [8.1 m]
Vertical clearance above deck:18.0 ft. [5.5 m]
Owner:City or Municipal Highway Agency [04]
Year built:1927
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Main span material:Concrete [1]
Main span design:Arch - Thru [12]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: October 2009

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:170 [as of 2003]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Sufficiency rating:43.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$525,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2009FairSatisfactoryFairSatisfactory17043.0
September 1998PoorFairSeriousVery Good5038.0
April 1991PoorSatisfactorySeriousVery Good50020.5