43RD STREET #14 over KANSAS RIVER TRIBUTARY
This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.
Map
Coordinates:
+39.05071, -94.8393439°03'03" N, 94°50'22" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | 43RD STREET #14 over KANSAS RIVER TRIBUTARY |
Structure number: | 526350460000014 |
Location: | 1.20E OF K 7 HWY |
Purpose: | Carries highway over waterway |
Route classification: | Collector (Urban) [17] |
Length of largest span: | 69.9 ft. [21.3 m] |
Total length: | 71.9 ft. [21.9 m] |
Roadway width between curbs: | 14.8 ft. [4.5 m] |
Deck width edge-to-edge: | 16.1 ft. [4.9 m] |
Owner: | City or Municipal Highway Agency [04] |
Year built: | 1920 |
Historic significance: | Bridge is possibly eligible for the National Register of Historic Places [3] |
Main span material: | Steel [3] |
Main span design: | Truss - Thru [10] |
Deck type: | Concrete Cast-in-Place [1] |
Latest Available Inspection: February 2009
Good/Fair/Poor Condition: | Poor |
Status: | Posted for load [P] |
Average daily traffic: | 74 [as of 2007] |
Truck traffic: | 6% of total traffic |
Deck condition: | Poor [4 out of 9] |
Superstructure condition: | Poor [4 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Basically intolerable requiring high priority of replacement [2] |
Deck geometry appraisal: | Equal to present minimum criteria [6] |
Water adequacy appraisal: | Equal to present desirable criteria [8] |
Roadway alignment appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
Sufficiency rating: | 13.6 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $576,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
February 2009 | Poor | Poor | Poor | Fair | 74 | 13.6 |
January 1997 | Poor | Poor | Satisfactory | Good | 200 | 47.1 |
May 1989 | Poor | Poor | Fair | Good | 200 | 40.2 |