OLD K132 HWY/K32 over KS RIV,1RR, FEDPRKLOT

Map 

Coordinates:
+39.08735, -94.65832
39°05'14" N, 94°39'30" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:OLD K132 HWY/K32 over KS RIV,1RR, FEDPRKLOT
Structure number:999903201052771
Location:1.25 MI E-I635
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:299.9 ft. [91.4 m]
Total length:2800.0 ft. [853.4 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:60.7 ft. [18.5 m]
Vertical clearance below bridge:18.7 ft. [5.7 m]
Skew angle:45°
Owner:State Highway Agency [01]
Year built:1988
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:11
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Not applicable [N]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: June 2015 

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:10,300 [as of 2014]
Truck traffic:11% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:83.8 tons [76.2 metric tons]
Inventory rating:35.0 tons [31.8 metric tons]
Sufficiency rating:78.2
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$5,023,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201578.2GoodGoodGoodGood-10300
June 201378.2GoodGoodGoodGood-10300
November 201176.5GoodGoodGoodGood-9910
December 200976.4GoodGoodGoodGood-10100
June 200775.6GoodGoodGoodGood-12300
November 200574.2GoodGoodGoodGood-16200
June 200373.4GoodGoodVery GoodGood-18500
October 200175.5GoodGoodVery GoodGood-12750
November 199975.5GoodGoodVery GoodGood-12500
August 199773.8GoodGoodVery GoodGood-11780
April 199549.1GoodGoodVery GoodVery Good-13330
June 199350.9GoodGoodVery GoodVery Good-13665
August 199143.4GoodGoodVery GoodGood-15650