Share:

I35 HWY, NB over TURKEY CREEK, NALL AVE

Map 

Coordinates:
+39.04714, -94.64893
39°02'50" N, 94°38'56" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:I35 HWY, NB over TURKEY CREEK, NALL AVE
Structure number:999903501050041
Location:0.56 MI NE JO COLN, NB
Purpose:Carries highway over highway and waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:65.0 ft. [19.8 m]
Total length:235.2 ft. [71.7 m]
Roadway width between curbs:62.7 ft. [19.1 m]
Deck width edge-to-edge:65.3 ft. [19.9 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Skew angle:13°
Owner:State Highway Agency [01]
Year built:1959
Year reconstructed:1989
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Not applicable [N]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: June 2016 

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:57,000 [as of 2015]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Superior to present desirable criteria [9]
Underclearances appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:66.9 tons [60.8 metric tons]
Inventory rating:28.9 tons [26.3 metric tons]
Sufficiency rating:87.4
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$509,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201687.4GoodGoodVery GoodVery Good-57000
June 201487.2GoodGoodVery GoodVery Good-59500
June 201285.2GoodGoodVery GoodVery Good-54650
June 201083.8GoodGoodVery GoodVery Good-58500
June 200883.8GoodGoodVery GoodVery Good-58000
June 200683.7GoodGoodVery GoodVery Good-57500
July 200483.5GoodGoodVery GoodVery Good-61500
May 200282.5GoodGoodVery GoodVery Good-57500
May 200082.2GoodGoodVery GoodVery Good-60715
June 199882.2GoodGoodVery GoodVery Good-60715
October 199683.6GoodGoodVery GoodVery Good-47400
August 199491.3GoodGoodVery GoodVery Good-47975
November 199289.6GoodGoodVery GoodVery Good-43040
June 199086.0GoodGoodVery GoodVery Good-36940