Facts 

Name:I35 HWY, SB over TURKEY CR, MILL STREET
Structure number:999903501050071
Location:1.02 MI NE US69
Purpose:Carries highway over highway and waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:71.9 ft. [21.9 m]
Total length:415.0 ft. [126.5 m]
Roadway width between curbs:62.7 ft. [19.1 m]
Deck width edge-to-edge:65.3 ft. [19.9 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1961
Year reconstructed:1989
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:8
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Not applicable [N]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: June 2016 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:52,000 [as of 2015]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:61.9 tons [56.3 metric tons]
Inventory rating:37.0 tons [33.6 metric tons]
Sufficiency rating:91.1
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$898,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201691.1FairSatisfactoryGoodGood-52000
June 201490.9FairSatisfactoryGoodVery Good-54000
June 201291.3FairSatisfactoryGoodVery Good-49900
June 201090.9FairSatisfactoryVery GoodVery Good-54000
June 200892.0GoodGoodVery GoodVery Good-53500
June 200691.1GoodGoodVery GoodVery Good-52000
July 200490.7GoodGoodVery GoodVery Good-55500
May 200290.9GoodGoodVery GoodVery Good-53500
May 200090.6GoodGoodVery GoodVery Good-56865
June 199890.6GoodGoodVery GoodVery Good-56865
November 199679.9GoodGoodVery GoodGood-45560
August 199490.1GoodGoodVery GoodGood-47405
January 199291.4GoodGoodVery GoodVery Good-43790
June 199085.1GoodGoodVery GoodVery Good-37710