Share:

I35 HWY, NB over TURKEY CR, MILL STREET

Map

Coordinates:
+39.05543, -94.63129
39°03'20" N, 94°37'53" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:I35 HWY, NB over TURKEY CR, MILL STREET
Structure number:999903501050081
Location:1.01 MI NE US69SL
Purpose:Carries highway over highway and waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:71.9 ft. [21.9 m]
Total length:395.4 ft. [120.5 m]
Roadway width between curbs:62.0 ft. [18.9 m]
Deck width edge-to-edge:65.3 ft. [19.9 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:32°
Owner:State Highway Agency [01]
Year built:1961
Year reconstructed:1988
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:7
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Not applicable [N]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: June 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:52,000 [as of 2015]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:61.9 tons [56.3 metric tons]
Inventory rating:37.0 tons [33.6 metric tons]
Sufficiency rating:91.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$845,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201691.0GoodGoodGoodGood-52000
June 201489.8GoodGoodGoodGood-54000
June 201290.2GoodGoodVery GoodGood-49900
June 201091.9GoodGoodVery GoodGood-54000
June 200892.0GoodGoodVery GoodVery Good-53500
June 200690.0GoodGoodVery GoodVery Good-52000
July 200489.7GoodGoodVery GoodVery Good-55500
May 200289.9GoodGoodVery GoodVery Good-53500
May 200089.5GoodGoodVery GoodVery Good-56865
June 199889.5GoodGoodVery GoodVery Good-56865
November 199682.7GoodGoodVery GoodVery Good-45560
August 199492.4GoodGoodVery GoodVery Good-47405
February 199294.7GoodGoodVery GoodVery Good-43790
June 199091.1GoodVery GoodVery GoodVery Good-37710