Share:

US50/US400 HWY over ARKANSAS RIVER DRAINAGE

Map 

Coordinates:
+37.86333, -100.55639
37°51'48" N, 100°33'23" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:US50/US400 HWY over ARKANSAS RIVER DRAINAGE
Structure number:999905000350041
Location:6.01 MI E FINNEY COLN
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:9.8 ft. [3.0 m]
Total length:20.7 ft. [6.3 m]
Owner:State Highway Agency [01]
Year built:1953
Year reconstructed:2011
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: April 2015 

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:4,560 [as of 2014]
Truck traffic:25% of total traffic
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:34.5 tons [31.4 metric tons]
Inventory rating:20.7 tons [18.8 metric tons]
Sufficiency rating:82.7
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$26,000

Previous Inspections 

DateSuff. RatingConditionCulvert ConditionSD/FOADT
April 201582.7Good7 out of 10-4560
April 201378.7Good7 out of 10-4560
May 201178.7Good7 out of 10-4790
April 200975.7Good7 out of 10-4320
April 200775.7Good7 out of 10-4120
April 200575.7Good7 out of 10-4020
April 200375.5Good7 out of 10-4330
April 200175.5Good7 out of 10-4550
November 199975.5Good7 out of 10-4455
April 199782.5Good7 out of 10-3750
September 199576.9Good7 out of 10-3440
March 199376.9Good7 out of 10-3300
April 199173.0Good7 out of 10-3390