US 50 HWY over ATSFRR & SAND CREEK

This bridge is no longer in the current National Bridge Inventory database, and has likely been demolished or abandoned.

Map

Coordinates:
+38.02623, -97.36113
38°01'34" N, 97°21'40" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:US 50 HWY over ATSFRR & SAND CREEK
Structure number:999905000400721
Location:1.36 MI. W. K-15 W. JCT.
Purpose:Carries highway over railroad and waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:125.0 ft. [38.1 m]
Total length:455.4 ft. [138.8 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:45.9 ft. [14.0 m]
Vertical clearance below bridge:23.0 ft. [7.0 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1975
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: October 2012

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:8,810 [as of 2011]
Truck traffic:17% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Equal to present minimum criteria [6]
Underclearances appraisal:Better than present minimum criteria [7]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Sufficiency rating:66.6
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$691,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
October 2012PoorGoodPoorGood881066.6
August 2011PoorGoodPoorGood872066.4
October 2010PoorGoodPoorGood872066.4
November 2009PoorGoodPoorGood957065.9
August 2008PoorGoodPoorGood926066.1
November 2006PoorGoodPoorGood1090057.3
September 2004PoorGoodPoorGood930058.3
September 2002FairGoodSatisfactoryGood769097.1
October 2000FairGoodSatisfactoryGood755596.2
August 1998FairGoodSatisfactoryGood762096.1
September 1996FairGoodSatisfactoryGood718595.3
December 1994GoodVery GoodVery GoodVery Good568595.9
July 1992GoodVery GoodVery GoodGood614595.7
October 1991GoodVery GoodVery GoodVery Good615595.7