Share:

US54/US400 HWY EB over I135 HWY EL-WL & Canal

Map 

Coordinates:
+37.67912, -97.31290
37°40'45" N, 97°18'46" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:US54/US400 HWY EB over I135 HWY EL-WL & Canal
Structure number:999905400872921
Location:JCT US54/I135
Purpose:Carries highway over highway and waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:120.1 ft. [36.6 m]
Total length:1039.4 ft. [316.8 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:54.5 ft. [16.6 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:13
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Epoxy Overlay [5]

Latest Available Inspection: August 2016 

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:56,500 [as of 2015]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:87.9 tons [79.9 metric tons]
Inventory rating:52.6 tons [47.8 metric tons]
Sufficiency rating:80.5
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$1,865,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
August 201680.5GoodGoodGoodGood-56500
August 201480.5GoodGoodGoodGood-55500
September 201280.5GoodGoodGoodGood-51500
August 201080.5GoodGoodGoodGood-51000
December 200980.5GoodGoodGoodGood-52000
September 200880.5GoodGoodGoodGood-50500
August 200680.5GoodGoodGoodGood-53000
August 200480.5GoodGoodGoodGood-52000
August 200280.5GoodVery GoodGoodGood-50500
April 200080.5GoodVery GoodGoodGood-43720
August 199880.5GoodVery GoodGoodGood-43720
May 199679.5GoodVery GoodVery GoodVery Good-40075
October 199597.0GoodVery GoodVery GoodVery Good-27485
August 199497.0FairSatisfactoryVery GoodVery Good-26505
March 199298.0GoodGoodVery GoodVery Good-30230
May 199098.0GoodGoodVery GoodVery Good-26355