Share:

US-54 HWY EB over CITY STS/ARKANSAS RIVER

Map

Coordinates:
+37.67899, -97.34196
37°40'44" N, 97°20'31" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:US-54 HWY EB over CITY STS/ARKANSAS RIVER
Structure number:999905400873761
Location:0.44 MI E SYCAMORE ST
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:160.1 ft. [48.8 m]
Total length:2908.3 ft. [886.4 m]
Roadway width between curbs:54.1 ft. [16.5 m]
Deck width edge-to-edge:56.8 ft. [17.3 m]
Vertical clearance below bridge:33.8 ft. [10.3 m]
Owner:State Highway Agency [01]
Year built:1994
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:27
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Precast Panels [2]
Wearing surface:Latex Concrete or similar additive [3]

Latest Available Inspection: August 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:52,000 [as of 2015]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Equal to present minimum criteria [6]
Underclearances appraisal:Better than present minimum criteria [7]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:45.9 tons [41.7 metric tons]
Inventory rating:29.9 tons [27.2 metric tons]
Sufficiency rating:91.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$5,418,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
August 201691.0GoodGoodGoodGood-52000
August 201491.1GoodGoodGoodGood-51000
August 201291.5GoodGoodGoodGood-47800
March 201095.6GoodGoodGoodGood-47350
September 200895.2GoodGoodGoodGood-51000
August 200694.2GoodGoodGoodGood-50500
August 200494.3GoodGoodGoodGood-49700
August 200292.1GoodGoodGoodGood-48150
April 200092.1GoodGoodGoodGood-47525
August 199892.1GoodGoodGoodGood-47525
November 199693.2GoodGoodGoodGood-40075
August 199496.2GoodVery GoodVery GoodVery Good-24180