Share:

US-73 NB HIGHWAY over PIPER CREEK

Map

Coordinates:
+39.14006, -94.89982
39°08'24" N, 94°53'59" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:US-73 NB HIGHWAY over PIPER CREEK
Structure number:999907301050691
Location:1.78 MILES N US-24
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:47.9 ft. [14.6 m]
Total length:122.4 ft. [37.3 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:42.0 ft. [12.8 m]
Owner:State Highway Agency [01]
Year built:1968
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: June 2015

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:10,550 [as of 2014]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Better than present minimum criteria [7]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:71.8 tons [65.3 metric tons]
Inventory rating:42.9 tons [39.0 metric tons]
Sufficiency rating:98.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$169,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201598.0GoodGoodGoodGood-10550
June 201398.0GoodVery GoodGoodVery Good-10550
May 201198.0GoodVery GoodGoodVery Good-10500
May 200998.0GoodVery GoodGoodVery Good-10700
June 200798.0FairSatisfactoryGoodVery Good-10650
June 200580.7FairSatisfactoryGoodVery Good-10200
June 200393.8GoodGoodGoodVery Good-10100
August 200196.1GoodGoodGoodVery Good-9585
October 199996.2GoodGoodGoodVery Good-8675
August 199796.2GoodGoodGoodVery Good-8175
April 199595.4GoodGoodVery GoodVery Good-7390
June 199396.5GoodGoodVery GoodVery Good-7130
May 199181.6GoodGoodVery GoodVery Good-5740

Element Data

Source: National Bridge Elements dataset, 2016 edition. This feature is experimental.
ElementUnitsQuantity1. Good2. Fair3. Poor4. Serious
Substructure
Reinforced Concrete Columneach66000
Reinforced Concrete Abutmentlinear ft.8480400
Bridge Rail
Reinforced Concrete Bridge Raillinear ft.245245000
Deck
Reinforced Concrete Slabsq. ft.4,9004,8029800
Wearing Surfacessq. ft.4,9004,80249490