Share:

I135 HWY NB/SB over EAST FORK CHISHOLM CREEK

Map

Coordinates:
+37.72977, -97.31704
37°43'47" N, 97°19'01" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:I135 HWY NB/SB over EAST FORK CHISHOLM CREEK
Structure number:999913500870221
Location:0.59 MI N 21ST ST
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:20.0 ft. [6.1 m]
Total length:129.9 ft. [39.6 m]
Skew angle:60°
Owner:State Highway Agency [01]
Year built:1970
Year reconstructed:2002
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: August 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:68,300 [as of 2015]
Truck traffic:9% of total traffic
Structural appraisal:Better than present minimum criteria [7]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:89.9 tons [81.7 metric tons]
Inventory rating:53.9 tons [49.0 metric tons]
Sufficiency rating:70.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$411,000

Previous Inspections

DateSuff. RatingConditionCulvert ConditionSD/FOADT
August 201670.0Good7 out of 10-68300
August 201470.0Good7 out of 10-67100
August 201270.0Good7 out of 10-63200
September 201070.0Good7 out of 10-60700
September 200870.0Good7 out of 10-62000
August 200670.0Good7 out of 10-64800
August 200470.0Good7 out of 10-63360
August 200269.5Good7 out of 10-76650
May 200059.4Fair5 out of 10-74760
August 199859.4Fair5 out of 10-74760
March 199669.4Fair6 out of 10-63080
July 199469.4Fair6 out of 10-46240
March 199258.4Fair5 out of 10-41110
May 199051.0Fair5 out of 10FO43950