Share:

I135 HWY SB over UP RR, CHISHOLM CR DRG

Map 

Coordinates:
+37.73557, -97.31735
37°44'08" N, 97°19'02" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:I135 HWY SB over UP RR, CHISHOLM CR DRG
Structure number:999913500870241
Location:1.00 MI N 21ST SB
Purpose:Carries highway over railroad and waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:153.6 ft. [46.8 m]
Total length:508.9 ft. [155.1 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:59.1 ft. [18.0 m]
Vertical clearance below bridge:22.3 ft. [6.8 m]
Skew angle:35°
Owner:State Highway Agency [01]
Year built:1970
Year reconstructed:2002
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: August 2016 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:34,150 [as of 2015]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Equal to present minimum criteria [6]
Underclearances appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:64.5 tons [58.6 metric tons]
Inventory rating:37.2 tons [33.8 metric tons]
Sufficiency rating:93.8
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$983,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
August 201693.8FairSatisfactoryGoodGood-34150
August 201493.8FairSatisfactoryGoodGood-33550
March 201393.9FairSatisfactoryGoodGood-32700
August 201294.0FairSatisfactoryGoodGood-31600
September 201094.1FairSatisfactoryGoodGood-30350
August 200994.1GoodGoodGoodGood-31000
August 200865.5PoorGoodPoorGood-32000
September 200765.4PoorGoodPoorGood-32600
August 200692.1GoodGoodGoodGood-32400
August 200494.0GoodGoodGoodGood-31680
August 200290.3GoodGoodGoodGood-38325
May 200085.0GoodGoodGoodGood-37380
August 199885.0GoodGoodGoodGood-37380
March 199674.7GoodGoodGoodGood-31540
July 199493.2GoodGoodGoodGood-23120
March 199293.4FairFairSatisfactoryGood-20555
May 199092.2FairFairSatisfactoryGood-21975