Share:

I135 HWY NB over UP RR,CHISHOLM CR DRG

Map

Coordinates:
+37.73574, -97.31711
37°44'09" N, 97°19'02" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts

Name:I135 HWY NB over UP RR,CHISHOLM CR DRG
Structure number:999913500870251
Location:1.01 MI N 21ST NB
Purpose:Carries highway over railroad and waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:151.9 ft. [46.3 m]
Total length:515.1 ft. [157.0 m]
Roadway width between curbs:89.9 ft. [27.4 m]
Deck width edge-to-edge:92.9 ft. [28.3 m]
Vertical clearance below bridge:22.3 ft. [6.8 m]
Skew angle:31°
Owner:State Highway Agency [01]
Year built:1970
Year reconstructed:2002
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: August 2016

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:34,150 [as of 2015]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Superior to present desirable criteria [9]
Underclearances appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:59.6 tons [54.2 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:93.8
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$1,599,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
August 201693.8FairSatisfactoryGoodGood-34150
August 201493.8FairSatisfactoryGoodGood-33550
March 201393.9FairSatisfactoryGoodGood-32700
August 201288.9FairSatisfactoryGoodGood-31600
September 201089.0FairSatisfactoryGoodGood-30350
August 200989.0GoodGoodGoodGood-31000
August 200859.3PoorGoodPoorGood-32000
September 200759.2PoorGoodPoorGood-32600
August 200688.5GoodGoodGoodGood-32400
August 200488.5GoodGoodGoodGood-31680
August 200267.9GoodGoodGoodGood-38325
May 200068.0GoodGoodGoodGood-37380
August 199868.0GoodGoodGoodGood-37380
March 199674.2GoodGoodGoodGood-31540
July 199475.8GoodGoodGoodGood-23120
April 199276.9FairFairGoodGood-21465
March 199276.0FairFairGoodGood-20555
May 199072.5FairFairGoodGood-21975