I135 HWY SB over RR , 12CITY ST& STRM

Map 

Coordinates:
+37.69617, -97.31655
37°41'46" N, 97°18'60" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:I135 HWY SB over RR , 12CITY ST& STRM
Structure number:999913500872901
Location:I135 WL VDT, ENG TO 18TH
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:106.0 ft. [32.3 m]
Total length:12497.3 ft. [3809.0 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:54.5 ft. [16.6 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Owner:State Highway Agency [01]
Year built:1977
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:203
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Epoxy Overlay [5]

Latest Available Inspection: August 2016 

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:47,850 [as of 2015]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Operating rating:64.1 tons [58.3 metric tons]
Inventory rating:38.4 tons [34.9 metric tons]
Sufficiency rating:76.3
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$22,419,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
August 201676.3GoodGoodGoodGoodFO47850
August 201476.3GoodGoodGoodGoodFO47300
August 201276.3GoodVery GoodGoodVery GoodFO43600
August 201076.3GoodVery GoodGoodVery GoodFO42750
September 200876.3GoodVery GoodGoodVery GoodFO44350
August 200676.3GoodGoodGoodVery GoodFO45750
August 200476.3GoodGoodGoodVery GoodFO46250
August 200275.5GoodGoodGoodGoodFO41300
May 200075.5GoodGoodGoodVery GoodFO44745
August 199875.5GoodGoodGoodVery GoodFO44745
June 199676.3GoodGoodGoodVery GoodFO38470
July 199486.8GoodGoodGoodVery GoodFO36490
March 199291.6GoodVery GoodVery GoodVery GoodFO30160
May 199091.6GoodVery GoodGoodVery GoodFO29750