Facts

Name:I135 HWY NB over RR , 12CITY ST& STRM
Structure number:999913500872911
Location:I135 EL VDT, ENG TO 18TH
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:106.0 ft. [32.3 m]
Total length:12111.2 ft. [3691.3 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:54.8 ft. [16.7 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Owner:State Highway Agency [01]
Year built:1977
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:196
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Epoxy Overlay [5]

Latest Available Inspection: August 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:47,850 [as of 2015]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Operating rating:64.1 tons [58.3 metric tons]
Inventory rating:38.4 tons [34.9 metric tons]
Sufficiency rating:76.5
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$21,726,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
August 201676.5GoodGoodGoodGoodFO47850
August 201475.5GoodGoodGoodGoodFO47300
August 201275.5GoodGoodGoodGoodFO43600
August 201075.5GoodGoodGoodGoodFO42750
September 200859.5GoodGoodGoodGoodFO44350
August 200659.5GoodGoodGoodGoodFO45750
August 200459.5GoodGoodGoodGoodFO46250
August 200258.7GoodGoodGoodGoodFO41300
May 200058.7GoodGoodGoodGoodFO44745
August 199858.7GoodGoodGoodGoodFO44745
June 199675.5GoodGoodGoodGoodFO38470
July 199487.8GoodGoodGoodGoodFO36490
March 199291.6GoodVery GoodVery GoodVery GoodFO30160
May 199091.6GoodVery GoodGoodVery GoodFO29750