Facts

Name:RP I135 NB/U54 WB over US 54-I135, 3 RAMPS
Structure number:999913500872991
Location:JCT I35W-US54 KELLOGG AVE
Purpose:Carries highway overpass (third level) over highway and waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:123.4 ft. [37.6 m]
Total length:1659.9 ft. [505.9 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:26.9 ft. [8.2 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Owner:State Highway Agency [01]
Year built:1977
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:20
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Epoxy Overlay [5]

Latest Available Inspection: August 2016

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:3,440 [as of 2000]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Better than present minimum criteria [7]
Underclearances appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:59.3 tons [53.9 metric tons]
Inventory rating:35.5 tons [32.3 metric tons]
Sufficiency rating:99.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$1,374,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
August 201699.0GoodGoodGoodVery Good-3440
August 2014100.0GoodGoodGoodGood-3440
August 2012100.0GoodGoodGoodVery Good-3440
September 201099.0GoodVery GoodGoodVery Good-3440
August 200999.0GoodGoodGoodVery Good-3440
October 200899.0GoodGoodGoodVery Good-3440
August 200799.0GoodGoodGoodVery Good-3440
August 200699.0GoodGoodGoodVery Good-3440
August 200499.0GoodGoodGoodVery Good-3440
November 200293.0GoodGoodGoodVery GoodFO3440
May 200093.0GoodVery GoodGoodVery GoodFO3440
July 199893.0GoodVery GoodGoodVery GoodFO3440
April 199692.0FairSatisfactoryGoodVery GoodFO3440
August 199492.0GoodGoodVery GoodVery GoodFO3440
March 199293.0GoodGoodVery GoodVery GoodFO3440
May 199093.0GoodGoodVery GoodVery GoodFO3440