Facts 

Name:RP U54 WB/I135 SB over I135 HWY EL&WL -CANAL
Structure number:999913500873061
Location:0.02MI. N US 54
Purpose:Carries highway over highway and waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:107.0 ft. [32.6 m]
Total length:462.6 ft. [141.0 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:32.5 ft. [9.9 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:State Highway Agency [01]
Year built:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:7
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Epoxy Overlay [5]

Latest Available Inspection: August 2016 

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:3,450 [as of 2000]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Superior to present desirable criteria [9]
Underclearances appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:67.3 tons [61.2 metric tons]
Inventory rating:40.3 tons [36.6 metric tons]
Sufficiency rating:99.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$479,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
August 201699.0FairSatisfactoryGoodVery Good-3450
August 201499.0GoodVery GoodGoodVery Good-3450
September 201299.0GoodVery GoodGoodVery Good-3450
August 201088.2GoodVery GoodGoodVery Good-3450
December 200987.2GoodGoodGoodVery Good-3450
September 200887.2FairSatisfactoryGoodVery Good-3450
August 200670.7FairSatisfactoryGoodVery Good-3450
August 200470.9FairSatisfactoryGoodVery Good-3450
August 200263.5GoodGoodGoodVery Good-3450
April 200063.4GoodGoodGoodVery Good-3450
August 199863.4GoodGoodGoodVery Good-3450
May 199649.9GoodGoodGoodGood-3450
August 199467.5GoodGoodGoodGood-3450
March 199279.7GoodGoodGoodVery Good-3450
May 199079.7FairSatisfactorySatisfactoryGood-3450