Facts

Name:US-169 HIGHWAY NB over KS RIVER,RR YARD,3 STR
Structure number:999916901050721
Location:0.55 MILES N I-35
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:334.0 ft. [101.8 m]
Total length:2018.1 ft. [615.1 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:38.7 ft. [11.8 m]
Vertical clearance below bridge:22.3 ft. [6.8 m]
Owner:State Highway Agency [01]
Year built:1933
Year reconstructed:1993
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Truss - Deck [09]
Deck type:Not applicable [N]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: June 2016

Good/Fair/Poor Condition:Fair
Status:Posted for other load-capacity restriction [R]
Average daily traffic:11,000 [as of 2015]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:71.6 tons [65.1 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Sufficiency rating:63.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$2,089,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201663.0FairGoodFairSatisfactoryFO11000
June 201562.9FairGoodFairSatisfactoryFO11350
May 201456.9FairGoodFairSatisfactoryFO11350
May 201357.6FairGoodFairSatisfactoryFO10000
July 201263.0FairGoodFairSatisfactoryFO9900
August 201163.3FairGoodFairSatisfactoryFO9450
July 201063.3FairGoodFairSatisfactoryFO9450
November 200963.4FairGoodFairSatisfactoryFO9250
July 200862.6FairGoodFairSatisfactoryFO11000
August 200761.6FairGoodFairSatisfactoryFO10900
July 200658.4FairGoodFairSatisfactoryFO10950
August 200559.5FairGoodFairSatisfactoryFO8750
December 200473.5FairGoodSatisfactoryGoodFO10450
June 200274.1FairGoodSatisfactoryGoodFO10205
October 200172.1FairGoodSatisfactoryGood-10280
May 200072.1FairGoodSatisfactoryGood-10290
December 199972.1FairGoodSatisfactoryGood-10290
October 199872.2FairGoodSatisfactoryGood-9990
June 199769.3FairGoodSatisfactoryGood-9700
March 199670.4FairVery GoodSatisfactoryGood-9590
May 199568.1FairVery GoodSatisfactoryGood-14525
August 199470.3FairVery GoodSatisfactoryGood-14005
November 199364.3FairVery GoodSatisfactoryGood-28970
February 199249.0FairFairFairFair-28555
August 199139.6FairFairFairFair-23345