Facts

Name:US-169 HIGHWAY SB over KS RIV/RR YARD/3 STR'S
Structure number:999916901052871
Location:0.55 MILES N I-35
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:334.0 ft. [101.8 m]
Total length:2018.1 ft. [615.1 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:32.8 ft. [10.0 m]
Vertical clearance below bridge:24.9 ft. [7.6 m]
Owner:State Highway Agency [01]
Year built:1993
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Not applicable [N]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: June 2015

Good/Fair/Poor Condition:Good
Status:Open, no restriction [A]
Average daily traffic:11,350 [as of 2014]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:68.4 tons [62.2 metric tons]
Inventory rating:40.9 tons [37.2 metric tons]
Sufficiency rating:79.6
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$2,089,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
June 201579.6GoodGoodGoodVery Good-11350
June 201378.3GoodGoodGoodVery Good-11350
June 201178.6GoodGoodGoodVery Good-9450
December 200978.6GoodGoodGoodVery Good-9250
June 200779.4GoodGoodGoodVery Good-10900
November 200579.6GoodGoodGoodVery Good-8750
June 200379.3GoodGoodVery GoodVery Good-10300
October 200179.3GoodGoodVery GoodVery Good-10280
October 199980.3GoodVery GoodVery GoodVery Good-10290
August 199779.9GoodVery GoodVery GoodVery Good-9700
May 199575.4GoodVery GoodVery GoodVery Good-14525
January 199478.3GoodVery GoodVery GoodVery Good-28970