Share:

HAYES-MAY ROAD over DOCTOR'S FORK

Map

Coordinates:
+37.66500, -84.96917
37°39'54" N, 84°58'09" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:HAYES-MAY ROAD over DOCTOR'S FORK
Structure number:011C00045N
Location:.7 MI S OF WHITES RD
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:29.9 ft. [9.1 m]
Total length:67.9 ft. [20.7 m]
Roadway width between curbs:18.7 ft. [5.7 m]
Deck width edge-to-edge:20.3 ft. [6.2 m]
Skew angle:15°
Owner:County Highway Agency [02]
Year built:1988
Year reconstructed:2012
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Prestressed concrete [5]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: September 2016

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:95 [as of 2006]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:17.9 tons [16.3 metric tons]
Inventory rating:17.9 tons [16.3 metric tons]
Sufficiency rating:72.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$170,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
September 201672.0FairGoodGoodSatisfactory-95
June 201570.0FairGoodGoodSatisfactory-95
September 201470.0FairGoodGoodSatisfactory-95
October 201282.2FairGoodVery GoodSatisfactory-95
October 201070.2FairFairFairSatisfactoryFO95
October 200870.2FairFairFairSatisfactoryFO95
October 200670.2FairFairFairSatisfactoryFO96
October 200470.2FairFairFairSatisfactoryFO55