LICK FORD RD over LICK FK NEWCOMBE CREEK
Map
Coordinates:
+38.03556, -83.0227838°02'08" N, 83°01'22" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | LICK FORD RD over LICK FK NEWCOMBE CREEK |
Structure number: | 032C00008N |
Location: | .5 MI S OF JCT KY 32 |
Purpose: | Carries highway over waterway |
Route classification: | Local (Rural) [09] |
Length of largest span: | 27.2 ft. [8.3 m] |
Total length: | 30.2 ft. [9.2 m] |
Roadway width between curbs: | 19.4 ft. [5.9 m] |
Deck width edge-to-edge: | 20.3 ft. [6.2 m] |
Owner: | County Highway Agency [02] |
Year built: | 1960 |
Year reconstructed: | 2016 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Main span material: | Steel [3] |
Main span design: | Stringer/Multi-beam or girder [02] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
Latest Available Inspection: December 2018
Good/Fair/Poor Condition: | Fair |
Status: | Posted for load [P] |
Average daily traffic: | 63 [as of 2009] |
Truck traffic: | 11% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Satisfactory [6 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Water adequacy appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Roadway alignment appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 59.7 |
Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
Estimated cost of work: | $65,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
December 2018 | Fair | Good | Satisfactory | Fair | 63 | 59.7 |
December 2016 | Fair | Good | Satisfactory | Fair | 70 | 59.6 |
December 2015 | Fair | Fair | Satisfactory | Fair | 70 | 7.9 |
December 2014 | Fair | Fair | Satisfactory | Fair | 70 | 7.9 |
December 2013 | Fair | Fair | Satisfactory | Fair | 70 | 7.9 |
December 2012 | Fair | Satisfactory | Satisfactory | Fair | 70 | 11.1 |
December 2011 | Fair | Satisfactory | Satisfactory | Fair | 70 | 11.1 |
December 2010 | Fair | Good | Satisfactory | Fair | 70 | 11.1 |
December 2009 | Fair | Good | Satisfactory | Fair | 70 | 15.7 |
December 2008 | Poor | Fair | Poor | Fair | 70 | 13.6 |
December 2007 | Fair | Fair | Fair | Fair | 70 | 13.6 |
December 2004 | Fair | Satisfactory | Fair | Fair | 49 | 17.6 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Steel Girder/Beam | linear ft. | 265 | 0 | 240 | 25 | 0 |
Deck |
Reinforced Concrete Deck | sq. ft. | 726 | 726 | 0 | 0 | 0 |
Substructure |
Reinforced Concrete Abutment | linear ft. | 67 | 63 | 4 | 0 | 0 |
Reinforced Concrete Pile Cap/Footing | linear ft. | 34 | 0 | 34 | 0 | 0 |
Bridge Rail |
Steel or Aluminum Bridge Rail | linear ft. | 60 | 60 | 0 | 0 | 0 |
Steel Protective Coating | sq. ft. | 302 | 302 | 0 | 0 | 0 |