KY-85 over POND RIVER
Map
Coordinates:
+37.39472, -87.3055637°23'41" N, 87°18'20" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | KY-85 over POND RIVER |
Structure number: | 054B00033N |
Old structure number: | 054*0085*B0033 (from 1992 edition) |
Location: | ON MCLEAN - HOPKINS CL |
Purpose: | Carries highway over waterway |
Route classification: | Major Collector (Rural) [07] |
Length of largest span: | 44.9 ft. [13.7 m] |
Total length: | 288.1 ft. [87.8 m] |
Roadway width between curbs: | 19.7 ft. [6.0 m] |
Deck width edge-to-edge: | 23.3 ft. [7.1 m] |
Owner: | State Highway Agency [01] |
Year built: | 1933 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 6 |
Main spans material: | Concrete [1] |
Main spans design: | Tee beam [04] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Low slump Concrete [4] |
Latest Available Inspection: May 2017
Good/Fair/Poor Condition: | Fair |
Status: | Open, no restriction [A] |
Average daily traffic: | 1,828 [as of 2014] |
Truck traffic: | 16% of total traffic |
Deck condition: | Good [7 out of 9] |
Superstructure condition: | Fair [5 out of 9] |
Substructure condition: | Fair [5 out of 9] |
Structural appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Somewhat better than minimum adequacy to tolerate being left in place as is [5] |
Roadway alignment appraisal: | Equal to present minimum criteria [6] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 65.4 |
Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
Estimated cost of work: | $756,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
May 2017 | Fair | Good | Fair | Fair | 1828 | 65.4 |
May 2015 | Fair | Good | Fair | Fair | 1828 | 65.4 |
May 2013 | Fair | Good | Fair | Fair | 1698 | 65.6 |
June 2011 | Fair | Good | Fair | Fair | 1650 | 64.3 |
June 2009 | Fair | Good | Fair | Fair | 1610 | 64.4 |
July 2007 | Fair | Good | Satisfactory | Fair | 1870 | 64.0 |
May 2005 | Fair | Good | Satisfactory | Fair | 1819 | 64.1 |
June 2003 | Fair | Good | Satisfactory | Fair | 1774 | 64.0 |
May 2001 | Fair | Good | Satisfactory | Fair | 1774 | 64.0 |
May 1999 | Fair | Good | Satisfactory | Fair | 1774 | 64.0 |
May 1997 | Fair | Good | Satisfactory | Fair | 1774 | 64.0 |
May 1995 | Fair | Good | Satisfactory | Fair | 1115 | 64.9 |
May 1993 | Fair | Good | Satisfactory | Fair | 1115 | 64.4 |
May 1991 | Fair | Good | Satisfactory | Fair | 1115 | 62.4 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Reinforced Concrete Girder/Beam | linear ft. | 1,152 | 1,092 | 50 | 10 | 0 |
Deck |
Reinforced Concrete Top Flange | sq. ft. | 6,709 | 6,709 | 0 | 0 | 0 |
Wearing Surfaces | sq. ft. | 5,706 | 5,186 | 500 | 20 | 0 |
Substructure |
Reinforced Concrete Column | each | 10 | 0 | 10 | 0 | 0 |
Reinforced Concrete Abutment | linear ft. | 80 | 70 | 10 | 0 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 110 | 70 | 20 | 20 | 0 |
Joints |
Pourable Joint | linear ft. | 120 | 0 | 0 | 0 | 120 |
Bridge Rail |
Reinforced Concrete Bridge Rail | linear ft. | 576 | 0 | 570 | 6 | 0 |