Name:KY-1316 over MOSBEY BR OF EAGLE CREEK
Structure number:094B00024N
Old structure number:094*1316*B0024 (from 1992 edition)
Location:.05 MI W OF JCT KY 2352
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:16.1 ft. [4.9 m]
Total length:60.0 ft. [18.3 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1951
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

Latest Available Inspection: April 2017

Good/Fair/Poor Condition:Fair
Status:Open, no restriction [A]
Average daily traffic:48 [as of 2016]
Truck traffic:3% of total traffic
Structural appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:43.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$180,000

Previous Inspections

DateConditionCulvert ConditionADTSuff. Rating
April 2017Fair6 out of 104843.3
April 2015Fair6 out of 104543.3
April 2013Fair6 out of 104543.3
April 2011Fair6 out of 106743.3
April 2009Fair6 out of 107043.3
May 2007Good7 out of 106643.3
June 2005Good7 out of 105643.3
April 2003Good7 out of 1020045.1
April 2001Good7 out of 1020045.1
April 1999Good7 out of 1020045.1
April 1997Good7 out of 109445.2
March 1995Good7 out of 108647.3
June 1993Good7 out of 108647.3
April 1991Good7 out of 108647.3

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Substructure
Reinforced Concrete Pile Cap/Footinglinear ft.1641200
Culvert
Reinforced Concrete Culvertlinear ft.112861880