BIG TWIN CREEK RD over PUNCHEON CAMP BRANCH

Map

Coordinates:
+38.57028, -84.93028
38°34'13" N, 84°55'49" W

Facts

Source: National Bridge Inventory. Information not verified; use at your own risk.
Name:BIG TWIN CREEK RD over PUNCHEON CAMP BRANCH
Structure number:094C00019N
Location:1.2 MI W.-KY.1761
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:32.2 ft. [9.8 m]
Total length:36.4 ft. [11.1 m]
Roadway width between curbs:11.2 ft. [3.4 m]
Deck width edge-to-edge:12.1 ft. [3.7 m]
Owner:County Highway Agency [02]
Year built:1984
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Wood or Timber [8]
Wearing surface:Bituminous [6]

Latest Available Inspection: January 2018

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:143 [as of 2006]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Basically intolerable requiring high priority of corrrective action [3]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Sufficiency rating:35.9
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$52,000

Previous Inspections

DateConditionDeckSuperstructureSubstructureADTSuff. Rating
January 2018FairSatisfactorySatisfactorySatisfactory14335.9
January 2017FairSatisfactorySatisfactorySatisfactory14351.2
January 2016FairSatisfactorySatisfactorySatisfactory14351.2
January 2015FairSatisfactorySatisfactorySatisfactory14351.2
January 2014FairSatisfactorySatisfactorySatisfactory14351.2
January 2013FairSatisfactorySatisfactorySatisfactory14351.2
January 2012FairSatisfactorySatisfactorySatisfactory14351.2
January 2011FairSatisfactorySatisfactorySatisfactory14351.2
February 2010FairSatisfactorySatisfactorySatisfactory14351.2
July 2008FairSatisfactorySatisfactorySatisfactory14351.2
April 2007FairSatisfactorySatisfactorySatisfactory14451.2
February 2006FairGoodSatisfactorySatisfactory10051.3

Element Data

Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
ElementUnitsQuantity1-Good2-Fair3-Poor4-Serious
Superstructure
Steel Girder/Beamlinear ft.219021900
Substructure
Reinforced Concrete Abutmentlinear ft.86741200
Deck
Timber Decksq. ft.437043700
Wearing Surfacessq. ft.412412000