Facts

Name:US-27 over BLANKET CREEK NR FOUR OA
Structure number:096B00008N
Old structure number:096*0027*B0008 (from 1992 edition)
Location:1 MI SO.OF JCT KY 1053
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:29.9 ft. [9.1 m]
Total length:132.6 ft. [40.4 m]
Roadway width between curbs:26.2 ft. [8.0 m]
Deck width edge-to-edge:30.5 ft. [9.3 m]
Owner:State Highway Agency [01]
Year built:1947
Year reconstructed:2011
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

Latest Available Inspection: February 2016

Good/Fair/Poor Condition:Fair
Status:Posted for load [P]
Average daily traffic:2,851 [as of 2012]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:68.9 tons [62.6 metric tons]
Inventory rating:42.9 tons [39.0 metric tons]
Sufficiency rating:69.7
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$554,000

Previous Inspections

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
February 201669.7FairGoodSatisfactorySatisfactory-2851
February 201468.9FairGoodSatisfactorySatisfactory-3134
February 201268.4FairVery GoodSatisfactorySatisfactory-3290
March 201036.0PoorPoorFairPoorSD3290
April 200836.0PoorPoorFairPoorSD3530
May 200654.7FairSatisfactoryFairFairFO3530
March 200452.7FairSatisfactoryFairFairFO4109
January 200266.6FairGoodGoodSatisfactoryFO3245
February 200066.6FairGoodGoodSatisfactoryFO3245
January 199866.6FairGoodGoodSatisfactoryFO3245
February 199666.6FairGoodGoodSatisfactoryFO3245
April 199474.2FairGoodGoodSatisfactoryFO2170
January 199274.2FairGoodGoodSatisfactoryFO2170
March 199074.2FairGoodGoodSatisfactoryFO2170