KY-139 over BURGE CREEK
Map
Coordinates:
+36.81806, -87.8150036°49'05" N, 87°48'54" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
Name: | KY-139 over BURGE CREEK |
Structure number: | 111B00012N |
Old structure number: | 111*0139*B0012 (from 1992 edition) |
Location: | 1.8 MI NOR. OF JCT KY 525 |
Purpose: | Carries highway over waterway |
Route classification: | Major Collector (Rural) [07] |
Length of largest span: | 44.9 ft. [13.7 m] |
Total length: | 194.9 ft. [59.4 m] |
Roadway width between curbs: | 23.0 ft. [7.0 m] |
Deck width edge-to-edge: | 25.9 ft. [7.9 m] |
Skew angle: | 45° |
Owner: | State Highway Agency [01] |
Year built: | 1932 |
Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
Design load: | M 13.5 / H 15 [2] |
Number of main spans: | 4 |
Main spans material: | Concrete [1] |
Main spans design: | Tee beam [04] |
Deck type: | Concrete Cast-in-Place [1] |
Wearing surface: | Low slump Concrete [4] |
Latest Available Inspection: June 2018
Good/Fair/Poor Condition: | Poor |
Status: | Open, no restriction [A] |
Average daily traffic: | 2,072 [as of 2017] |
Truck traffic: | 12% of total traffic |
Deck condition: | Poor [4 out of 9] |
Superstructure condition: | Poor [4 out of 9] |
Substructure condition: | Poor [4 out of 9] |
Structural appraisal: | Meets minimum tolerable limits to be left in place as is [4] |
Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
Water adequacy appraisal: | Superior to present desirable criteria [9] |
Roadway alignment appraisal: | Equal to present desirable criteria [8] |
Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
Sufficiency rating: | 49.2 |
Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
Estimated cost of work: | $633,000 |
Previous Inspections
Date | Condition | Deck | Superstructure | Substructure | ADT | Suff. Rating |
---|
June 2018 | Poor | Poor | Poor | Poor | 2072 | 49.2 |
June 2016 | Poor | Poor | Poor | Poor | 1830 | 49.4 |
June 2014 | Poor | Poor | Poor | Poor | 1956 | 49.3 |
June 2012 | Poor | Poor | Poor | Poor | 1810 | 49.4 |
June 2010 | Poor | Poor | Poor | Poor | 1960 | 49.3 |
June 2008 | Poor | Poor | Poor | Poor | 1860 | 49.4 |
August 2006 | Fair | Fair | Fair | Fair | 2160 | 67.7 |
June 2004 | Fair | Fair | Fair | Fair | 2083 | 67.8 |
July 2000 | Fair | Fair | Fair | Fair | 2057 | 67.8 |
July 1998 | Fair | Fair | Fair | Fair | 2057 | 67.8 |
June 1996 | Fair | Fair | Fair | Fair | 2057 | 64.8 |
June 1994 | Fair | Satisfactory | Fair | Fair | 1388 | 66.2 |
June 1992 | Fair | Satisfactory | Fair | Fair | 1388 | 65.6 |
June 1990 | Fair | Satisfactory | Fair | Fair | 1388 | 65.6 |
Element Data
Source: National Bridge Elements dataset, 2019 edition. This feature is experimental.
Element | Units | Quantity | 1-Good | 2-Fair | 3-Poor | 4-Serious |
---|
Superstructure |
Reinforced Concrete Girder/Beam | linear ft. | 975 | 0 | 939 | 36 | 0 |
Deck |
Reinforced Concrete Top Flange | sq. ft. | 5,051 | 0 | 5,051 | 0 | 0 |
Wearing Surfaces | sq. ft. | 4,481 | 0 | 4,441 | 40 | 0 |
Substructure |
Reinforced Concrete Column | each | 6 | 0 | 0 | 6 | 0 |
Reinforced Concrete Pier Wall | linear ft. | 90 | 0 | 0 | 90 | 0 |
Reinforced Concrete Abutment | linear ft. | 86 | 0 | 86 | 0 | 0 |
Reinforced Concrete Pier Cap | linear ft. | 120 | 0 | 0 | 120 | 0 |
Joints |
Pourable Joint | linear ft. | 99 | 0 | 0 | 0 | 99 |
Bridge Rail |
Steel or Aluminum Bridge Rail | linear ft. | 390 | 0 | 390 | 0 | 0 |
Steel Protective Coating | sq. ft. | 1,950 | 1,950 | 0 | 0 | 0 |