Share:

US0090B over HARVEY CANAL/STS/RR

Map 

Coordinates:
+29.92680, -90.03925
29°55'36" N, 90°02'21" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:US0090B over HARVEY CANAL/STS/RR
Structure number:022602830900002
Location:1.4 MI WEST OF LA 23
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Tolls:Yes, on Interstate toll segment under Secretarial Agreement [4]
Length of largest span:375.0 ft. [114.3 m]
Total length:29033.6 ft. [8849.0 m]
Roadway width between curbs:52.2 ft. [15.9 m]
Deck width edge-to-edge:54.8 ft. [16.7 m]
Vertical clearance below bridge:95.1 ft. [29.0 m]
Owner:State Highway Agency [01]
Year built:1987
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Steel continuous [4]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: November 2016 

Good/Fair/Poor Condition:Poor
Status:Open, no restriction [A]
Average daily traffic:39,120 [as of 2015]
Truck traffic:13% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Serious [3 out of 9]
Structural appraisal:Basically intolerable requiring high priority of corrrective action [3]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Basically intolerable requiring high priority of replacement [2]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:72.8 tons [66.2 metric tons]
Inventory rating:42.9 tons [39.0 metric tons]
Sufficiency rating:50.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$147,192,000

Previous Inspections 

DateSuff. RatingConditionDeckSuperstructureSubstructureSD/FOADT
November 201650.0PoorFairFairSeriousSD39120
December 201552.0PoorFairFairSeriousSD39120
December 201452.0PoorFairFairSeriousSD54420
December 201352.0PoorFairFairSeriousSD53820
December 201252.0PoorFairFairSeriousSD54960
December 201152.0PoorFair-SeriousSD55980
July 200897.0FairSatisfactorySatisfactoryGood-49140
June 200697.0GoodGoodGoodVery Good-51060
August 200297.0GoodVery GoodVery GoodVery Good-49920
July 199895.0GoodVery GoodVery GoodVery Good-47802
December 199495.0FairSatisfactoryGoodGood-35016
August 199496.0GoodVery GoodGoodGood-33996
November 199296.0GoodGoodVery GoodVery Good-51067
August 198997.0GoodVery GoodVery GoodVery Good-51067